Taylormade timber – Sawmill Extension

Project Overview

“We’re building an exciting new extension at TaylorMade Timber in Durham. Right now, our team is handling all concrete construction work on site. Firstly, we’re managing the formwork installation. Additionally, we’re placing steel reinforcement. Finally, we’re completing all concrete works with our expert in-house team. Moreover, this project shows how we deliver excellence across the North East. As a result of our integrated approach, we maintain the highest standards in every aspect of construction.”

Technical Details

“Our team uses advanced systems for this industrial project. Specifically, we chose high-strength shuttering for precise formwork. Furthermore, we installed specialized steel bars to support heavy machinery. Meanwhile, our concrete mix meets strict industrial standards. Most importantly, we focus on durability and strength in every pour. Because of our attention to detail, the finished structure will handle intense sawmill operations perfectly.”

Project Highlights

• Expert in-house team delivering complete FRC package • Custom concrete mix for industrial use • Strong focus on safety – zero incidents • Quality checks at every stage • Full compliance with BS EN standards • Local Durham-based delivery team

 

Formwork installation retaining walls

Sprinkler base Powerfloat finish

Retaining walls between 8m in height and 4.2m

Kalfass

Location: Durham

Date: 24.05.24 - Present

Cost: £TBC

Contractor: David Hardie Engineering

Client: James Jones